SMART PROJECT SCHEDULING FOR CONSTRUCTION PROJECTS USING AI
Joel Macwan
Student of construction engineering and management M. Tech, Birla Vishwakarma mahavidhyalaya, Anand, Gujarat, India , IN
Prof. Amitkumar N. Bhavsar
Student of construction engineering and management M. Tech, Birla Vishwakarma mahavidhyalaya, Anand, Gujarat, India , IN
Dr. Mohammedshakil Malek
Student of construction engineering and management M. Tech, Birla Vishwakarma mahavidhyalaya, Anand, Gujarat, India , IN
Keywords: Project scheduling, Project management, software, scheduling algorithms, allocation, make-span.
Abstract
planning and scheduling are two stepping stones for any project as without careful planning and scheduling of any project, the project is destined to face a lot trouble down the road in completion. And so, planning and scheduling for any project should be considered vital and given required care. However, scheduling a big project is no easy feat. Problems of scheduling of such projects are said as resource constrained scheduling problem (RCPSP). in RCPSP scheduling of the project is carried out considering the one objective function that is to reduce the make-span and two constraints (1)resource constrains (2)precedence constrains. For solution of such a problem an algorithm has been generated in this thesis using heuristics. This algorithm solves the RCPSP and tries to obtain the near optimal solution. A few sample examples have been performed to opt for better priority rule and evaluate the framework. Also, A case study also has been provided at the end for evaluation of the algorithm.