🕔 Call For Paper — Vol. 12  |  Issue 4  |  December 2026  |  Deadline: 20-Dec-2026
Track Paper Submit Paper Contact

Paper Details

Home › Archives › Paper Details
← Back to Issue
Vol. 5  No. 3 (2019) · Articles

IDENTIFICATION FACTORS FOR LABOUR PRODUCTIVITY FOR CONSTRUCTION PROJECT

Mr. Brijesh Rathod
ME Second year Student,Civil Dept. S.N.P.I.T & RC,Umarakh, Bardoli, Gujarat , IN

Asst.Pro. Neetu Yadav
ME Second year Student,Civil Dept. S.N.P.I.T & RC,Umarakh, Bardoli, Gujarat , IN

Asst.Pro.Vyom Pathak
ME Second year Student,Civil Dept. S.N.P.I.T & RC,Umarakh, Bardoli, Gujarat , IN

📅 Published: March 2019

Keywords: labour productivity, benchmarking , RII ( relative important index)

📄 View / Download PDF ⬇ Download

Abstract

Labour performance is key factor of every successful project. Because of poor labour productivity project may costlier, more completion time of project.Top level management believes that poor labour productivity is one of the primary reasons why construction projects in India exceeded their anticipated budget and schedules. This paper focuses on labour productivity for construction sector. The survey was carried out by a questionnaire survey. The analysis of questionnaire has been done by using RII (Relative important index) method. Total questionnaire distributed 200 among which we have received feedback from 149 site engineers, labour contractors and contractors. The outcome of study is help increase labour productivity and benchmarking. The study has been done for Surat city form Gujarat state only.

How to Cite

Mr. Brijesh Rathod, Asst.Pro. Neetu Yadav, Asst.Pro.Vyom Pathak, “IDENTIFICATION FACTORS FOR LABOUR PRODUCTIVITY FOR CONSTRUCTION PROJECT,” International Journal of Technical Innovation in Modern Engineering & Science, vol. 5, no. 3, pp. 906-909, March 2019.

References

NA

🔒 Content is protected — © IJTIMES