🕔 Call For Paper — Vol. 12  |  Issue 4  |  December 2026  |  Deadline: 20-Dec-2026
Track Paper Submit Paper Contact

Paper Details

Home › Archives › Paper Details
← Back to Issue
Vol. 5  No. 14 (2019) · Articles

ELEMENTS OF COST OVERRUNS AND DELAYS IN CONSTRUCTION PROJECT

Shahnewaj Haider
PG Student,Department of Civil Engineering, Sharda University , IN

Pinaki Prasanna Nayak
PG Student,Department of Civil Engineering, Sharda University , IN

📅 Published: April 2019

Keywords: cost overruns, Time overruns, project controlling, Construction, survey

📄 View / Download PDF ⬇ Download

Abstract

There have been many surveys and studies to determine the cause of the overrun of time and cost overrun
in construction projects which lead to delay completion of the project time and cost are the lifeline of every project.
It is of paramount importance to study, analyze and evaluate the common factors that lead to these restrictions and
suggest the best mitigation measures to overcome constraints of time and cost overrun. During the construction
phase is the primary responsibility of the project managers to monitor the costs and time and avoid both cost
overruns and time. Because of these limitations, this document describes the real cost and time overrun control
practices in the construction industry.

How to Cite

Shahnewaj Haider, Pinaki Prasanna Nayak, “ELEMENTS OF COST OVERRUNS AND DELAYS IN CONSTRUCTION PROJECT,” International Journal of Technical Innovation in Modern Engineering & Science, vol. 5, no. 14, pp. -, April 2019.

References

NA

🔒 Content is protected — © IJTIMES