Feasibility Study of ROB at various Level Crossing in Vidarbha Region.

Authors

  • Amarendra Jaltare Mtech-Structures (pursuing PhD), KDKCOE Nagpur
  • Dr. S. R. Choudhari Principal, J.D. College of Engineering Nagpur

Keywords:

ROB, Level Crossing, Traffic, RDSO, TVU, Future Track, Railway Boundary

Abstract

This paper deals with the methodology for the inception of ROBs proposed to be constructed at various level crossings under taken by Maharashtra State Road Development Corporation. The object of this paper is to bring more clarity on the aspects, which may prove helpful to the designers/planners while planning an ROB, by making optimum utilization of the policy of the Railways. We hope, with the proper knowledge of working of Railway department and their requirement, the ROB projects implementation would be a smooth process in the development of the Nation thus realizing the dream of our Hon. Prime Minister NarendraModi and Union Minister for Road Transport & Highways Shri Nitin Gadkari.

Downloads

Published

2021-11-07

How to Cite

Jaltare, A., & R. Choudhari, D. S. (2021). Feasibility Study of ROB at various Level Crossing in Vidarbha Region . International Journal of Technical Innovation in Modern Engineering & Science, 3(7), 47–50. Retrieved from https://ijtimes.com/index.php/ijtimes/article/view/1034