FACTORS AFFECTING SCHEDULING OF MULTIPLE PROJECTS

Authors

  • Darshit R. Shah Master of Technology, Construction Project Management, Second year student, Faculty of Technology, Civil Engineering Department-Parul Institute of Technology (PIT), Parul University, P.O.Limda, Tal. Waghodia, City-Vadodara, 391760, Gujarat, India
  • Dixit N. Patel Assistant professor, Parul Institute of Technology (PIT), Parul University, P.O.Limda, Tal. Waghodia, CityVadodara, 391760, Gujarat, India

Keywords:

multi-projects scheduling, factors affecting scheduling

Abstract

The management of multi-projects scheduling is not simply an aggregate of single project because the owner has to face too many constraints. But if considering that all constraint and make scheduling so during execution project work is completed as per the scheduled time. In many areas, there is no use of proper scheduling techniques. Therefore, most of projects are delay and their cost is increases. At planning stage prepare schedule and tracking of that schedule at regular interval is very essential. The aim of the paper is to identify the factors affecting of scheduling of multiple projects in Indian construction industry.

Downloads

Published

2018-03-07

How to Cite

Shah, D. R. ., & Patel, D. N. . (2018). FACTORS AFFECTING SCHEDULING OF MULTIPLE PROJECTS. International Journal of Technical Innovation in Modern Engineering & Science, 4(3), 17–20. Retrieved from https://ijtimes.com/index.php/ijtimes/article/view/1901