🕔 Call For Paper — Vol. 12  |  Issue 3  |  September 2026  |  Deadline: 20-Sep-2026
Track Paper Submit Paper Contact

Paper Details

Home Archives Paper Details
← Back to Issue
Vol. 5  No. 5 (2019) · Articles

An Analysis of Cost Overruns and Time Overruns for Construction Projects using AHP

Ankit.A. Marathe
Student of M.Tech. Construction Engineering and Management, Birla Vishwakarma Mahavidyalaya, Vallabh Vidyanagar, Anand, Gujarat. , IN

Dr. Jayeshkumar Pitroda
Student of M.Tech. Construction Engineering and Management, Birla Vishwakarma Mahavidyalaya, Vallabh Vidyanagar, Anand, Gujarat. , IN

Dr. Rajiv Bhatt
Student of M.Tech. Construction Engineering and Management, Birla Vishwakarma Mahavidyalaya, Vallabh Vidyanagar, Anand, Gujarat. , IN

📅 Published: May 2019

Keywords: Construction Industry, Time Over-runs, Cost Overruns, Questionnaire, Factors, Causes, Delay, Projects

📄 View / Download PDF ⬇ Download

Abstract

Today India is the second quickest developing economy on the planet. The Indian development industry is a vital piece of the economy and a channel for a maintainable piece of its improvement speculation. The development business in India is balanced for development because of industrialization, urbanization, financial improvement and individuals' rising desires for better nature of living. In India, the development business is the second biggest industry next just to farming. Its commitment to GDP (Gross Domestic Product) 2011-12 is about 10%. It utilized 45 million faculty including both talented and incompetent laborers, experts, foreman, administrative staff and specialists. The development business in India expects a development rate of 7-8% per annum throughout the following 10 years. With expanding push on creating foundation and alluring concessions seeming private association in framework extends, the Indian development industry is as of now blasting and ready to see a greater development in not so distant future.

How to Cite

Ankit.A. Marathe, Dr. Jayeshkumar Pitroda, Dr. Rajiv Bhatt, “An Analysis of Cost Overruns and Time Overruns for Construction Projects using AHP,” International Journal of Technical Innovation in Modern Engineering & Science, vol. 5, no. 5, pp. 447-455, May 2019.

References

NA

🔒 Content is protected — © IJTIMES