Completed State and Construction Stage Analysis of Suspension Bridge
Divi Jahnavi
Department of Structural engineering, PG Student, Vignan deemed to be University , IN
Sana Sultana
Department of Structural engineering, PG Student, Vignan deemed to be University , IN
Ariga Veerendra Reddy
Department of Structural engineering, PG Student, Vignan deemed to be University , IN
Kunda Aruna Reddy
Department of Structural engineering, PG Student, Vignan deemed to be University , IN
Sk mohammad Abid
Department of Structural engineering, PG Student, Vignan deemed to be University , IN
Keywords: long-span suspension bridge, MIDAS, construction stage, completed state analysis, backward construction stage.
Abstract
Suspension bridges are categorized as long span structures. The proposed suspension bridge analysis is classified into construction stage and also completed state inspection and analyzed with Modeling, Integrated Design and Analyzing Software (MIDAS). The completed state investigation is carried out to control the disposition of the total bridge under other loads being as live, seismic and wind loadings. It is so possible to complete a linearized analysis for the supplementary constant loads. The construction stage is accomplish to review the structural balance and consider sectional forces as the time of erection and also in backward sequence from the state of equilibrium as defined by the initial equilibrium state analysis
How to Cite
References
NA