Analysis & Design of Conventional & Pre-engineered G+4 storey Industrial steel building
Monika Nakum
M.E (Student, Structural Engineering) Civil, Arham Veerayatan Institute of Engineering and Research , IN
Jigar Zala
M.E (Student, Structural Engineering) Civil, Arham Veerayatan Institute of Engineering and Research , IN
Darshan Shah
M.E (Student, Structural Engineering) Civil, Arham Veerayatan Institute of Engineering and Research , IN
Keywords: PEB, CSB, STAAD-pro, Multi storey, IS: 800:2007
Abstract
PEB is one of fastest emerging industry in world. By adapting the use of PEB Structure compared to CSB structure results many advantages. In this paper, CSB (Conventional steel building) & PEB (Pre engineered steel building) were designed as per IS 800:2007. Here, we have considered 5 different types of plan area. Models were being analysed in STAAD-pro. After analyzing the results of PEB & CSB Structure, the PEB Structure is lighter than CSB structure. Also the governing lateral force found in the model is seismic.
How to Cite
References
NA