🕔 Call For Paper — Vol. 12  |  Issue 4  |  December 2026  |  Deadline: 20-Dec-2026
Track Paper Submit Paper Contact

Paper Details

Home › Archives › Paper Details
← Back to Issue
Vol. 4  No. 10 (2018) · Articles

EARNED VALUE ANALYSIS AND COST CONTROL OF A PROJECT

Anup Bhave
PG student, civil engineering, Dr. DIT, Pimpri, Pune, , IN

Deepa A Joshi
PG student, civil engineering, Dr. DIT, Pimpri, Pune, , IN

📅 Published: October 2018

Keywords: earned value analysis, cost control, lean construction, project management, lean thinking

📄 View / Download PDF ⬇ Download

Abstract

Earned value is used to evaluate the progress of a project. It measures the cost of work performed up to the project status date to examine the cost and schedule accomplished are progressing in accordance to the plan. The earned value calculation helps in evaluating economic status of the project. This paper summarizes effective use of earned value analysis with the help of MS Project and study status
of the project. It was studied that the project had cost overrun and was behind schedule.

How to Cite

Anup Bhave, Deepa A Joshi, “EARNED VALUE ANALYSIS AND COST CONTROL OF A PROJECT,” International Journal of Technical Innovation in Modern Engineering & Science, vol. 4, no. 10, pp. 371-373, October 2018.

References

NA

🔒 Content is protected — © IJTIMES